2YZ1500-74JG type integrated gas filling equipment is suitable for CNG gas filling substations with daily gas production of 15000-25000Nm3, and can work in gas filling station processes without gas storage wells and gas cylinder groups. The PLC control cabinet is built in the unit room, no need to build an electric control room.
Parameter Reference
Operating temperature (℃) | -40-40 |
Inlet pressure (MPa) | 3-20 |
Discharge pressure (MPa) | 25 |
Flow rate (Nm3/h) | 360-2500 |
Average displacement (Nm3/h) | 1500 |
Motor power (kW) | 2×37 |
Ave.power consumption (kW.h/Nm3) | 0.04 |
Noise (dB(A)) | ≤75 |
Size (mm) | 8690×2460×3900 |
Dispenser | 2set |
Storage cylinder (m3) | 6 |
Total power (kW) | 82 |
Features
(1) Equip with gas storage well pressure gauges and detectors, reasonable adjustment of gas station inflation sequence and gas well pressure.
(2) Realize the staggered gas supply and reduce the energy consumption of gas filling stations.
(3) Equip with combustible gas detection alarm, strictly monitor gas leakage.
(4) With RS-485 communication interface, it can be used for network expansion.
(5) The unit comes with instrument air, without external control air.
(6) Integrated dual tank truck air unloading device, which can unload air on two tank trucks at the same time.
2YZ1500-74JG type integrated gas filling equipment is suitable for CNG gas filling substations with daily gas production of 15000-25000Nm3, and can work in gas filling station processes without gas storage wells and gas cylinder groups. The PLC control cabinet is built in the unit room, no need to build an electric control room.
Parameter Reference
Operating temperature (℃) | -40-40 |
Inlet pressure (MPa) | 3-20 |
Discharge pressure (MPa) | 25 |
Flow rate (Nm3/h) | 360-2500 |
Average displacement (Nm3/h) | 1500 |
Motor power (kW) | 2×37 |
Ave.power consumption (kW.h/Nm3) | 0.04 |
Noise (dB(A)) | ≤75 |
Size (mm) | 8690×2460×3900 |
Dispenser | 2set |
Storage cylinder (m3) | 6 |
Total power (kW) | 82 |
Features
(1) Equip with gas storage well pressure gauges and detectors, reasonable adjustment of gas station inflation sequence and gas well pressure.
(2) Realize the staggered gas supply and reduce the energy consumption of gas filling stations.
(3) Equip with combustible gas detection alarm, strictly monitor gas leakage.
(4) With RS-485 communication interface, it can be used for network expansion.
(5) The unit comes with instrument air, without external control air.
(6) Integrated dual tank truck air unloading device, which can unload air on two tank trucks at the same time.